Ormond Beach, Florida
Regency Parking Deck

PROJECT DESCRIPTION
The Regency Parking Deck project in Ormond Beach, Florida, focused on restoring and strengthening critical structural components to improve the long-term performance and durability of the structure. Our scope of work included approximately 900 cubic feet of structural concrete repairs, replacement of expansion joints, structural crack repairs, and structural steel connection repairs at beam ends. To complete the restoration, our team installed the Sikalastic 1500 vehicular traffic coating system to provide added protection against wear and environmental exposure. The completed project delivered a reinforced, long-lasting parking structure designed to improve both functionality and structural integrity.
SCOPE OF WORK
Structural Concrete Repairs - 900 CF
R/R Expansion Joints
Structural Crack Repairs
Structural Steel Connection Repairs at Beam Ends
Sikalastic 1500 Vehicular Traffic Coating System
Contact
Joesph D. Hiller Engineering, LLC