Jacksonville Beach, Florida
Pier Point
PROJECT DESCRIPTION
The Pier Point Restoration Project in Jacksonville Beach, FL, focused on revitalizing outdoor spaces with its scope of work. The project team applied specialized waterproofing techniques to ensure the durability and water resistance of key areas. This involved carefully applying hot-applied waterproofing materials to prevent water penetration, while also removing planter boxes from the pool deck with minimal impact on surrounding surfaces. The Hanover paver system was installed to enhance both the functionality and aesthetics of the outdoor space. Throughout the project, the team prioritized attention to detail, safety, and adherence to the highest construction standards, ensuring a long-lasting and visually appealing final result for the community.
SCOPE OF WORK
Pool deck plantar removal
Hot applied waterproofing
Hanover paver system